St. John’s Fire District – Station #3
Built concurrently with the St. John’s Fire District Headquarters building.
- Date: May 2014
- Client: St. John’s Fire District
- Project Type: Renovation
About this Project
Built concurrently with the St. John’s Fire District Headquarters building. The station boasts a 4,300 square foot bay area that can house four pieces of fire and emergency equipment. Pre-engineered metal building with metal wall and roof panels. Interior walls to be metal studs and sheetrock. Started out as a 1,100 SF structure. Hill upgraded it to an 8,000 SF metal building.
![Enhanced3 St Johns](https://hillcon.com/wp-content/uploads/2023/02/Enhanced3-St-Johns-scaled.jpg)