The Park West Pool Facility is 14,530 square feet and constructed out of CMU load bearing and pre-engineered aluminum frame. The roof is single ply on bar joist with translucent fiberglass panels. The facility consists of a building pad, pool enclosure structure, swimming pool, wood framed program building, pre-engineered picnic shed, and locker rooms with showers and restrooms.

For this project Hill self-performed the excavation, sidewalks, concrete and caulking and installed the doors, hardware, toilet accessories and toilet partitions. Throughout the project Hill worked closely with the Mount Pleasant Recreation Department through review boards and meeting all necessary guidelines.