The CCSD Stadium project is located at 1000 Warrior Way, Mt. Pleasant, SC 29466.

Project Manager: Bart Bodkin 

Architect: McMillan Pazdan Smith Architecture 

Owner: Charleston County School District

Project Overview:

The project consists of a new design-build athletic stadium at Wando High School.

 July Project Updates:

Pressbox brick is ongoing

Preparations are being made for job wide OSF overhead inspection on 7/30

Roof work is ongoing on the Field House

Site hardscape is ongoing

Concrete hardscape is ongoing

Track D-Zones are being constructed

Site grading is ongoing

Metal wall panels have started on the Field House

Interior paint has started

Sheetrock hanging in the Pressbox is upcoming

 

 

June Project Updates:

Pressbox & Field House brick are ongoing

Pressbox steel is complete

Pressbox metal framing has started

Overhead rough-In is ongoing in the Home Concourse, Field House, & Visitor’s Concession

Roof work has started on the Field House & Visitor’s Concession

Visitor’s bleachers are complete

Home bleachers are ongoing

Field turf installation is ongoing

Scoreboard installation is ongoing

Site grading in nearly complete

Concrete hardscape is ongoing

Site lighting bases are ongoing

Track D-Zones are being constructed

 

May Project Updates:

Home concourse interior masonry is ongoing

Pressbox masonry is ongoing

Pressbox steel is ongoing

Visitor’s concession masonry is ongoing

Field House metal trusses have started

Home & Visitor’s bleacher foundations are complete

Home concourse roofing is complete

Field preparation for turf contractor mobilization is ongoing

 

April Project Updates:

4/30

Home concourse masonry is ongoing

Pressbox masonry is ongoing

Home concourse & pressbox steel has started

Field House masonry has started

Visitor’s bleacher foundations are ongoing

Visitor’s concession building slab prep is ongoing

Field preparation for turf contractor mobilization is ongoing

4/13

Home concourse slabs-on-grade are complete

Home building 308 vertical CMU is ongoing

Field house slab-on-grade is complete

Elevator pit waterproofing is nearly complete

Visitor's bleacher foundations have started

Visitor's concession building slab prep has started

Field preparation for turf contractor mobilization is ongoing

 

March Project Updates:

3/26

 

Field house and home concourse plumbing rough-in ongoing

Elevator pit waterproofing and concrete are ongoing

Storm drainage nearly complete

Pressbox foundation and elevator pit to be poured this week

3/19

Home concourse building foundations to finish this week

Field house masonry stem walls complete

Plumber roughing in under home concourse slabs

Storm drainage should be 95% complete the week of 3/19

 

Previous Project Updates: 

Water and sewer on-going

Field house foundations started

1/3 of the footings poured

Prepare the concrete, storm drain and sewer

Site Demo

Underground Utilities

Earthquake drains and sewer installed

Sitework on-going