The MUSC Hollings Cancer Center 7th Floor Core Lab Renovation project consisted of the shared support core renovation of approximately 3,300 S.F. The scope of the renovation included a complete interior demolition and the new construction included interior partitions, hollow metal frames, flush wood doors, glass & automatic entrances, door hardware, drywall, acoustical ceilings, resilient flooring, painting, demountable partitions, wall and corner guards, laboratory casework, fire sprinkler, plumbing, HVAC, electrical, fire alarm, and access control.